A Designer’s Renovation – Part 3

The Renovation REALLY starts!

The day after we received our permit, we set out to get things done. As a result of my neighbour and the permit process, we had lost over two months of precious time.

The first thing on our list, was to dig out some footings in our basement, to support the opening we created on the floor above.  My kitchen was to open up from a tiny 11’ x 12’ space to a 22’ x 12’ stunner.  But to do so, meant a big beam, and some supports.

Continue reading “A Designer’s Renovation – Part 3”